Ashutosh Mishra

Projects

Enhanced Manipulator Control for Solar Infrastructure Deployment

Human-in-the-loop verification of UR16e manipulator control for precise assembly under uncertain terrain and visual conditions.

Dates
October 2024 to November 2024
Field site
JAXA Space Exploration Test Field, Sagamihara
Stack
UR16e, OpenCV, ArUco markers, MoveIt, ROS
The UR16e arm on its construction pallet, gripping the stowed solar panel stack before extension, JAXA Space Exploration Test Field.
The UR16e arm on its construction pallet, gripping the stowed solar panel stack before extension, JAXA Space Exploration Test Field.

Deploying solar infrastructure on the lunar surface means precise assembly by a manipulator that cannot fully trust its own perception: the terrain is uneven, the lighting is directional and harsh, and there is no operator standing next to it.

This work performed human-in-the-loop verification and validation of UR16e manipulator control for those assembly and deployment tasks, using ArUco markers and OpenCV for pose estimation under exactly those uncertain visual conditions.

The same arm holding the fully extended solar tower.
The same arm holding the fully extended solar tower.

Publications from this work

Research direction